Cartergate Offices

​

Completed in June 2017, This project was the first in which Amptron utilised 'Building Information Modelling' or BIM software to design the Electrical and Mechanical Services. Amptron works with the main contractor the Gelder Group to design and install this new 3 storey office building in Grimsby.

  • Incoming Electrical Services

  • Main LV Distribution

  • Electrical Distribution & Switchgear

  • Small Power

  • Busbar System

  • General and Emergency Lighting

  • External Lighting

  • Data System

  • Telephony Systems

  • Induction Loop

  • Assistance Toilet Alarm

  • Refuge Alarm

  • Fire Alarm

  • Access Control

  • CCTV

  • Lightning Protection

  • Solar PV

  • Above Ground Drainage

  • Domestic Hot & Cold Water

  • Gas Services

  • Heating System

  • VRF Systems

  • Heat Recovery Ventilation

  • Dirty Air Extract

Estimated Cost:
£1,300,000